All Projects
Sappi Landfill: Cell 13 Construction
Our Scope
Ranger completed the construction of Cell 13 at the Sappi Landfill site, handling full site grading, installation of new leachate collection piping, and a seamless tie-in between Cell 9 and Cell 13. Every element was built to spec and to the strict environmental standards these systems demand.
Challenges Overcome
Landfill cell construction isn’t forgiving — drainage slopes, liner systems, and pipe elevations must be exact. Ranger met every requirement through careful prep, daily QA checks, and real-time field adjustments that kept the project compliant and on schedule.
Value Added
This work calls for precision, and that’s what Ranger delivers. Our teams brought experience, adaptability, and discipline to a job where small missteps have big consequences. We collaborated closely with Sappi and their engineering partners to ensure nothing was missed, and no time was wasted. With Ranger, clients get straight answers, tight execution, and a final product that’s built to do its job — day in, day out.